The First excavation of the site
Shuttering for the slab
Shuttering for the telescope piers. These are deeper and insulated from the main slab
The telescope pier foundations go in first
First 6M of slab finished.
Getting ready for the last piece of slab
Spreading the concrete with some help from the digger
September 20th. The warm room is on site
Getting ready to pour the first 6M of slab
Ready for the next 6M of slab
Jim in action with the first layer under the mesh
But it still needs a lot of Jim power
Foundation pates are in place and the first row of timber laid
First pouring of concrete with reinforcing mesh.
A lot of hard work by Jim and we have 2/3 of a slab
Mesh down middle layer of concrete
Then the finished slab
All we need now is for the rain to stop, maybe tomorrow
The two domes are on St.Martins Quay waiting transport to the site
22nd September The warm room build is in progress. Terry D and Mark on the case,.